Offering complete Turn-key Solutions as EPC Contractor for Electro-Mechanical Works in the INDUSTRIAL, INFRASTRUCTURE & COMMERCIAL Sectors.

Industrial And Infrastructure sector:

  • Electrical Distribution Substation (Core Electrical Equipment)
  • Pumping Substations (Main Pumps, MCC, PLC & SCADA)
  • EHV / HV Cable LayingWorks
  • OHLWorks
  • Street Lighting
  • Water Treatment Plants

Commercial Sector:

  • Supply, Installation, Testing & Commissioning for Building Services
  • Electrical (Power, Lighting, Fire Detection & Alarm)
  • HVAC & Fire Fighting
  • Plumbing & Drainage
  • ELV Systems Installations (CCTV, Public Address, Access Control)
  • Building Management System (BMS)

Client

Description

ASHGHAL

Construction and Upgrade of Rayyan Road Project 7; Contract 2 West of Olympic R/A to West of Rayyan R/A Street Lighting works

ASHGHAL

Peripheral & Surrounding Roads at Qatar National Museum - Supply, Installation, Testing & Commissioning of : Electrical and Street lighting works.

QPMC

Qabbro Terminal Expansion Project & 33KV Primary Substations - Detailed Design, Supply, Installations and Testing and Commissioning of Electrical/ELV and Mechanical System for Various buildings.

Doha Bank

Doha Bank Fit-Out works at new Branch in Al Gharafa- Supply, Installation, Testing & Commissioning of Complete Mechanical and Electrical Works

ASHGHAL

Construction of Health & Wellness Care Center @ UMMSALAL , complete MEP & D including fire protection works

Qatar Petroleum

GT14101600- Maintenance of lighting Installation on Call of Basis in Dukhan Fields ( IFM Dept. and Gas Production Dept)

Dr. Qaradawi

MEP Works for Dr.Qaradawi Villa

ASHGHAL

PWA/GTC/068/2011-2012: Street Lighting works in Doha South and Other Areas of Qatar.

SOLID - Qatar Petroleum

Contract No. GC12104000: Street lighting & Electrical works for construction of new Roads and Upgrading of existing roads in Dukhan.

Gulf Steel

Supply, installation and Commissioning of Substation for Workshop and Office block for Gulf Steel Company.

ASGHAL
Consultant:M/s Technical S.P.A.

Development of Roads in Bani Hajer – Zone 51 – Street lighting and Electrical works Supply, Install and commissioning of Complete street lighting poles, Luminaries,feeder pillars,and Electrical works includes supply, install and jointing works of HV/MV Cables as per ASHGAL and KAHRAMAA standard.

Client

Description

Completion Date

EATOPIA Multi Cuisine Restaurant - The Gate Mall

Supply, Installation, Testing and commissioning and maintenance of plumbing / Fire fighting, Air Conditioning and Electrical works inlcuding low current systems (FIT-OUT WORKS)

2014

Qatar Petroleum

Replacement of MV Panel at Sub-Station C QP Ras Abu Aboud, Doha

2014

Qatar Petroleum

Tender No.GT12100700 EPIC for Road Upgrade from Station N to Khuff H/L Within Dukhan Fields

2014

ASHGHAL

CP756 ( QN061), M&E including Scada works for construction of extension of Al Khor TSE Reuse

2014

Salam Bounian

MEP Service Modification Works at GF-23A. GF-238, 1 F-34, 1 F·34A and  KIOSK Shops- The Gate Mall

2014

Laila Shops

MEP Modification Works at GF24,GF24A,GF24B,GF 25-The Gate

2014

Qatar 2022 Supreme Committee

MEP Fit out works - Al Bidda Tower 22nd,40th, 41ST and Part of Mezzanine floor Supply,Installation,Testing & Commissioning of Plumbing, Drainage & Fire fighting works, HVAC, Electrical

2014

Qatar Fuel Additives Company Limited (QAFAC)

Design, Fabrication, Inspection, Testing & Supply of Seawater Filter System including installation of GRP pipes.

2014

Blink Shop

Supply, Installation, Testing and commissioning and maintenance of plumbing /Fire fighting, Air Conditioning and Electrical works ( FIT-OUT WORKS)

2014

ASGHAL-BARWA CITY
Consultant : M/s AECOM

Supply, Installation, Testing and commissioning and maintenance of plumbing /Fire fighting, Air Conditioning and Electrical works FIT-OUT WORKS

2014

Qatar Petroleum

Street lighting and Electrical Substation upgrade works for Road Upgrade Zikreet – Cluster2 within Dukhan Fields

2013

Al Ansar Residential Development

Supply installation and commissioning of Complete electrical works, Air-conditioning works, Fire Fighting, Drainage works. Including : Supply Installation and Commissioning of Transformer. ,Transformer Inspection and Verification Works and HV Termination works

2013

ASHGHAL
Consultant:M/s White Young

AL WAAB Complex Public Roads - Package 1,2&3 Street lighting and Electrical works -Supply, Install and commissioning of Complete street lighting poles, Luminaries, feeder pillars, and Electrical works includes supply, install and jointing works of HV/MV Cables as per ASHGAL and KAHRAMAA standard.

2013

QatarOlympic Committee-QNOC

Design, Supply & Installation of heavy Escalator Bullet Trap at Al Lusail Shooting Range – Qatar Olympic Committee

2013

Qatar National Cement Company

Design, Engineering, Testing & Commissioning of 250 TPD Calcium carbonate Plant at Umm-Bab

2013

Spicy Pickle - The Gate

Supply installation and commissioning of Complete electrical works, Air-conditioning works, Fire Fighting works for Spicy Pickle at the Gate.

2012

Salam Bounian
Consultant:M/s AECOM

Construction, Commissioning Testing and Maintenance of MEP works to Floor 4,5 and 6 of Salam Bay tower II of the Gate, 4000sqm .

2012

Hamad Hospital
Consultant:KEO International

Al Wakrah Hospital Modification works Phase I & II : Design, Supply, Installation, Testing and Commissioning of all the electrical, mechanical, plumbing and drainage works.

2012

7 For All Man kind Shop

Supply installation and commissioning of Complete electrical works, Air-conditioning works, Fire Fighting Modification works

2012

Boss Orange Shop

Supply installation and commissioning of Complete electrical works, Air-conditioning works, Fire Fighting Modification works

2012

Salam Denim Shop

Supply installation and commissioning of Complete electrical works, Air-conditioning works, Fire Fighting Modification works

2012

REDCO / Commercial Bank

Supply installation , testing and commissioning of Electrical Works, Air-conditioning works, Plumbing & Drainage, Fire Fighting works for Commercial bank building at Al Khartiyat

2012

Al Wakrah Hospital

Modification works Phase II : Design, Supply, Installation, Testing and Commissioning of all the electrical, mechanical, plumbing and drainage works.

2012

MBCO Restaurant

Supply installation and commissioning of Electrical Works, Air-conditioning works, Plumbing & Drainage, Fire Fighting works.

2012

LA MARTINE

Supply installation and commissioning of Complete electrical works, Air-conditioning works, Fire Fighting Modification works, Back Ground Music System and Networking and cabling

2012

JUST CAVALI BOUTIQUE

Supply installation and commissioning of Air-conditioning works, Fire Fighting Modification works and Complete electrical Works, Music System

2012

CANALI SHOP

Supply installation and commissioning of Air-conditioning works, Fire Fighting Modification works and Complete electrical Works.

2012

NAKILAT

Design. Fabricate, Testing, Inspection, Supply and Supervision of Installation and Commissioning of CompAir Compressor, Oil Injected screw and Air-cooled intercooler and after cooler.

2012

ROCCO BAROCO

Supply installation and commissioning of Complete electrical works, Air-conditioning works, Fire Fighting Modification works, Back Ground Music System and Networking and cabling

2012

SMC / Sports Club (Scoreboard) Sports Club (Aspire Zone)

Supply installation and commissioning of Air-conditioning works, Fire suppression system , Lighting , Cabling, Power supply and BMS Works.

2011

AMANA/ QGC factory Qatari German Switchgear Company

Supply Installation, Testing and commissioning of complete MEP works including Fire Alarm, Fire Fighting and Air Conditioning for Qatari German Switchgear Factory

2011

Aluminium Technology Auxiliary industries

Supply, Installation and Commissioning of Saltreat RO System

2011

ITC / SALAMMETACOAT (Factory) SALAM METACOAT

Supply installation and commissioning of Electrical Works, Air-conditioning works, Plumbing & Drainage, Fire Fighting works.

2011

The Gate / La Martine Atlier 21

Supply installation and commissioning of Complete electrical works, Air-conditioning works, Fire Fighting Modification works, Back Ground Music System and Networking and cabling

2011

Qatar National Cement Company

Replacement of Overhead Electrical Line of 6.6kV at Umm-Bab Seashore

2011

NDIA / ADCC New Doha International Airport

Supply, Installation, Erection, Commissioning & Testing of 14 Electric Overhead Cranes at the New Doha International Airport ( NDIA ) for Maintenance Hanger
2 nos. Double girder suspension cranes 15 ton x 31/25 m span with latching operation
2 nos. Double girder suspension cranes 15 ton x 31.5 m span with latching operation
5 nos. Single girder suspension crane 2.5 ton x 21 m span
1 no. Double girder overhead crane 12 ton x 22.8 m span
1 no. Single girder overhead crane 2.5 ton x 7.5 m span
1 no. Single girder overhead crane 2 ton x 11 m span
1 no. monorail chain hoist 2.5 ton
1 no. monorail chain hoist 2 ton