| Client |
Description |
Completion Date |
The Gate / MBCO Restaurant Atlier 21 |
Supply installation and commissioning of Electrical Works, Air-conditioning works, Plumbing & Drainage, Fire Fighting works. |
2011 |

See The Full Gallery |
The Gate / Rocco Baroco Shop Atlier 21 |
Supply installation and commissioning of Complete electrical works, Air-conditioning works, Fire Fighting Modification works, Back Ground Music System and Networking and cabling |
2011 |

See The Full Gallery |
The Gate / La Martine Atlier 21 |
Supply installation and commissioning of Complete electrical works, Air-conditioning works, Fire Fighting Modification works, Back Ground Music System and Networking and cabling |
2011 |

See The Full Gallery |
The Gate / Just Cavali Boutique Salam Industries |
Supply installation and commissioning of Air-conditioning works, Fire Fighting Modification works and Complete electrical Works, Music System. |
2011 |

See The Full Gallery |
The Gate / Canali Shop Salam Industries |
Supply installation and commissioning of Air-conditioning works, Fire Fighting Modification works and Complete electrical Works. |
2011 |

See The Full Gallery |
| Qatar National Cement Company |
Replacement of Overhead Electrical Line of 6.6kV at Umm-Bab Seashore |
2011 |
 |
| Qatar National Cement Company |
Design, Engineering, Supply, Installation, Testing and Commissioning of 6.6Kv / 440 V Sub-Station for the Housing Estate at Umm Bab on Turnkey Basis |
2010 |
 |
| Qatar Petroleum |
Contract No. MC10100800 Supply, Installation and Commissioning of Two (2) PCR's at QP Refinery, Mesaieed |
2010 |
| KAHRAMAA |
Tender No. : LTC 216/2007 Replacement of 2 x 25 MVA, 66KV/11KV, 50 Tons Transformers along with Earthing Transformer at Old Ghanim S/S, including dismantling, Termination T&C of 66kv & 11kv Cables, Re-Engineering of New Aux, MK & AVR Panels to operate with existing protection & control scheme at QG, adding new foundation & trenches, testing & commissioning and Energization |
2010 |
 |
| ASHGAL |
Development of Roads in South Khalifa & Markhiya Zone (34)
Supply and Installation of 415V (MV) cables for 5 km; - Supply of lighting poles; - Supply of Feeder pillars |
2010 |
| Qatar National Olympic Committee |
Al Wusyl Shooting Range Project Supply Installation , Commissioning and Maintenance of Electronic Display and Target System, Compack and Sporting, Trap & Skeet Equipment, Tower Launcher etc. |
2007 |
| Qatar National Cement Company |
Tender No. 01/2005 Design, Engineering, Procurement, Installation, Testing and Commissioning of 33/6.6 kv Sub-station for New Cement Plant No. 3 at Umm Bab |
2007 |
| Qatar National Cement Company |
EPIC of SCADA & Control for E12 S/S / National Control Center to transfer signals of E12 S/S (Cement Plant-3) in addition to metering values to the National Control Center including installation of Interface Panel, RTU & Fiber Optic. |
|
| Qatar Petroleum |
EPIC for Replacement of Main Distribution board for Desalter System in Refinery No.2 Unit 11 at QP Refinery, Mesaieed. |
2007 |
| Qatar Petrochemical Company |
Replacing Rails of Jetty Crane. For both rails of LDPE loading side jetty including replacement of buffer end stops (Total length of both rails 530m),rails of Sulphur loading side jetty including replacement of buffer end stops ( total length of both rails -267). |
2007 |
Qatar General Electricity and Water Corp. Siemens Consortium |
GTC /21/2004
Reinforcement works at Naeeja, Al-Sowaidi & Abu Hamour Substations |
2005 |
| Qatar Steel Company |
Tender No. PW/01/TDER-056/2004
Engineering, Fabrication, Supply, Installation & Commissioning of Top Gas Scrubber Related DR Innovation items |
2005 |
| Qatar National Cement Company |
Engineering, Design, Supply, Installation and training of Kilns dedusting system at cement plant no. 1. The projects consist of installation of Nos. Electrostatic precipitators from FLS Airtech, 3 Nos. Kiln I.D. Fans, New dust transport system, 1 No. Chimney, 1 No. Return dust silo and Gas Analyzer. |
2004 |
| Al Fozan |
Engineering, Supply, Installation, Commissioning and Third Party Inspection of 2 Nos. Ton Demag Double Girder Crane |
2004 |
| Qatar National Cement Company |
Engineering, Supply and supervision of Flow Feeders and Weigh Feeders for Kilns Raw Mills, Cement Mills & Lime Plant at Cement Plant - I / Schenck Process GmbH. |
2004 |
| Qatar National Cement Company |
Engineering, Supply, Supervision and Commissioning of Modified Shell Liners and Diaphragms for optimization of production capacity - Cement Plant II /Felon & Lange |
2004 |
| Qatar Steel Company |
Supply, Installation & Commissioning of 15 Ton EOT Magnet Crane - Inverter Driven (Demag Cranes & Components) |
2004 |
| Qatar National Cement Company |
Engineering, supply, Installation, Testing and Commissioning of New 6.6 Kv Substation for Qatar National Cement Company in partnership with ASEC Automation - Egypt |
2004 |
Qatar General Electricity and Water Corp. Siemens Consortium |
GTC 30/2002 EPC of Transmission Network Reinforcements Related to Ras Abu Aboud Power & Desalination Station |
2004 |
Trags (QP-Education City for Qatar Foundation) Siemens India Limited |
RFS8349 – Education City for 38 Nos. 3.3kV Switchgear |
2003 |
| Qatar General Electricity and Water Corp. |
GTC 30 / 2001 Engineering consultancy Services for Qatar Transmission system Expansion Stage 1 |
2003 |
Qatar Petroleum STDN DENORA, Siemens, KSB Amri, Zamil Steel, Conpipe, Grandi Lavori, SKM |
Ras Laffan Common Cooling water System Project consisting of: - Electrochlorination Plant - 33KV Switchgear - 2x Transformer - MOV Valves - Steel Structure - Fire Water Line - Armour Rock- Small size Butterfly valves - HVAC |
2003 |
| Qatar National Cement Company |
Overhauling of Kiln #1 for Qatar National Cement Company in partnership with ASECS Egypt |
2003 |
| Qatar National Cement Company |
Design, Supply and Commissioning of 1 (one) Set Gear rim in Two pieces with pinion and spring plates (total 2 sets) for Kiln - III & Cooler-III for Qatar National Cement Company / CMD |
2003 |
| Qatar National Cement Company |
Design , Supply & commissioning of (2) Nos. Driving Units for Air Separators and Raw Mills No.2 in the Cement Plant #1 at Umm Bab. |
2002 |
| Ministry of Electricity & Water |
Repair & Refurbishment of Mitsubishi Gas Turbines, Combustor Baskets & Clamshells for MHI -701 reference tender no. 53-1997/98, Ras Abu Fontas Power & Water Generation Plant |
2002 |
QAF/Qatar Shooting Association Laporte |
Supply, Installation and Commissioning of Shooting Range Equipment (Trap & Skeet Equipment) including electronic
system & display panels for Qatar Armed Force & Qatar Shooting Federation. |
2002 |
Qatar General Electricity & Water Corp. Lahmeyer Int'l |
Techno-Economic Consultancy Services for Acquisition of Power and Desalination Stations of KAHARAMAA by Qatar
Electricity and Water Company. |
2002 |
LURGI / NODCO Germanischer Lloyds |
Third party Inspection Services for NODCO Refinery Expansion Project |
2002 |
| Qatar National Cement Company |
Design, Manufacture, Supply, Erection, Supervision and Commissioning of ENVIRO Seal for Kiln #1 inlet for Qatar National Cement Company in partnership with Phillips Kiln Services, India |
2001 |
| Qatar National Cement Company |
Supply & Commissioning of 3 (Three) nos. of Rotary Vane Compressors Row 300H (S) Equipped with noise Enclosure and Oil Pump and Spare Parts Kit for Two Years Operation. |
2001 |
| Siemens AG / Qatar Steel Company |
Erection and Installation work for Electric Arc Furnace No. 3 of Qatar Steel Company.
Installation of Equipment - 850 tons comprising of major electrical equipment : 98 Ton TCIR Transformer, 81.65 ton 120 MVA, 66 kv Transformer, Medium and High Voltage Cable laying, Installation of High Voltage Switchgear |
1999 |
| Preussag Wassertechnik, GmbH, Qatar Steel Company |
Erection & Installation work for CC3 Water Treatment Plant.
Erection and alignment of equipment and Piping, Electrical & Instrumentation, Direct Water Cooling Pipe Line, Indirect Water Cooling Pipe Line |
1999 |
| MIDMAC |
Supply, Installation & Commissioning of Theater Stage & auditorium equipment for the Qatar Foundation for Education, Science & Community Development |
1999 |
| Qatar Steel Company |
Procurement, installation, supervision & commissioning of Sea Water Pump for CC #3 Water Treatment Plant with motor and motor starter. Pump type & capacity : Double suction Valute pump model 700 x 500 CHNM, 3 670 m3/h, 3.3 kv, 40 m head, 600 kw at 593 rpm. |
1998 |
| QASCO / Al Muftah |
Demag Double Girder Crane Model ZKKE 15 ton, 20 m span, DN 15018, Lifting Class H2B3 for an air separation plant. |
1998 |